1. Home
  2. Insights
  3. What is limiting tonnes per hour in your crushing and screening plant?

What is limiting tonnes per hour in your crushing and screening plant?

Low tonnes per hour rarely comes down to one machine. The restriction may sit in feed control, screening, material flow, operating practices or another stage of the circuit.

 

A plant can contain equipment capable of the required production rate and still consistently miss target. The reason is simple: the circuit only performs as well as the stage currently restricting it. Finding that restriction requires looking at how material moves through the entire plant under normal operating conditions.

 

Feed that is not consistent

Crushers and screens perform best when material arrives at a reasonably controlled rate. When feed constantly surges and falls away, the plant alternates between being overloaded and underutilised. The result can be unstable production even when individual machines appear busy.

 

Common feed problems include

  • Material being tipped faster than the plant can accept it
  • Loader cycles creating repeated surges and gaps
  • Feeder settings remaining unchanged as material conditions vary
  • Changes in feed size or moisture affecting plant behaviour
  • A restriction further down the circuit

    The primary crusher is not always the stage controlling throughput. If a screen, conveyor, transfer point or stockpile cannot accept the material being produced upstream, the rest of the circuit eventually has to slow down.

     

    This is why increasing the setting or speed of one machine does not automatically increase overall plant output.

     

     

    Where Restrictions Commonly Appear

  • Screening capacity that cannot handle the circulating load
  • Conveyors operating close to their practical capacity
  • Transfer points that restrict flow or repeatedly build up
  • Stockpile or discharge capacity limiting material movement
  • Screening performance

    Screening problems can quietly consume a large amount of plant capacity.

     

    When material is not separated effectively, oversize or misplaced product may circulate through the plant again. This increases load on crushers, conveyors and screens without necessarily increasing saleable production.

     

    Deck condition, screen media, feed distribution and operating conditions should therefore be considered when investigating poor throughput.

     

     

    Operating variation between shifts

    The same plant can produce very different results depending on how it is operated.

     

    Different settings, responses to changing conditions and decisions around feed can create significant variation from one shift to another. When good operating practice exists only in the experience of a few individuals, production becomes difficult to repeat consistently.

     

    A stable process should not depend entirely on who happens to be operating the plant.

     

     

    Uncounted operating time

    Not every production loss appears as a major breakdown.

     

    Short interruptions such as clearing blockages, waiting for material, repositioning equipment or restarting after a stop can appear insignificant individually. Repeated across every shift, they can remove a meaningful amount of available production time.

     

    This is why monthly tonnes alone do not always explain where capacity is being lost.

     

     

    How to find the real restriction

    Start with what the plant is actually producing during productive running time.

     

    Then follow the material through the circuit and compare what each stage is being asked to handle with what it is practically able to process. Feed behaviour, plant settings, operating practices and repeated interruptions should all be considered together.

     

    The objective is not to assume where the problem sits.

     

    It is to identify the stage or condition that is genuinely limiting the rest of the operation.

     

     

    Want to understand what is limiting your plant?

    A Plant Performance & Throughput Review looks at the circuit as a complete system to identify where performance is being lost and which areas should be addressed first.

    Book a Consultation